中文版 ENGLISH
         
   
 
       
 
Root
 

 

Temac root products
Technical parameter
Temac No asbestos root brand is ,Concrete type and technical parameter,etc. are seen and tabulated
Install guidance
Correct a root is installed to lengthening service life , it is very important to reduce the maintenance cost, whether so mounting disc root please according to following procedure:
n Pull out and fetch tools to take out a root with special-purpose a root, clear up the sealed letter.
n It check have axle because the skew and the excessive to wear and tear for side direction , guarantee axle and interval of letter not sealed the even, can exceed not wanting not for records of 3% of widths of rooting interval size, the partial displacement of the axle can't exceed 0 of the axle foot-paths 0.1%.
n Cut first circle records of especially important root, should accomplish carefully, its length needs to make testing at the axle , other cut of a root that enclose can be according to this. Need every circle to interlock and go on according to 180 degrees or the direction of 90 degrees while clogging a root.
n If the condition permits , the mounting disc root can twine and clog along the axle.

Medium Specified working pressure of the valve(Pn) Pressure of packing of a root (Pi)
Liquid 0-40bar 2XPn(Minimum 5N/mm2 )
>40bar 1.5XPN
Gas 0-40bar 5XPn(Minimum 10N/mm2)
40-200bar 2.5-5XPn
>200bar 1.5XPn
Attention:
Mounting disc is it rotate valve stem , guarantee records of pressure that root being packed reach the above giving a recommendation value constantly to want at the root, at the same time the valve be able to be opened flexibly. After using 24 hours , need to reexamine the tight strength that the sealed letter pigeonholes , so as to ensure the pressure of packing of a root.

To the best pressure that a root packs of the pump:

To pack pressure (Pi )1 , medium of working pressure generally sealed records of root of letter of pump. 5-2 times, but pi, still with a lot of factors, the structure like the pump in fact, the situation of the sealed letter, medium temperature, viscidity,etc. have something to do, decision this pi need in scene according to actual working condition and make, in order to guarantee sealing property of pump fully. In the mounting disc root, must be careful, after putting a root well, must start the pump , then could begin to seal the bolt that the letter pigeonholed closely slowly , until the fact that pump does not leak, observe one minute, can urgent half a nut so as to ensure and seal according to situation.

   
   
 
 
   
 
 
 
 
 
 
   
 
 
 
     
 
   
  Shanghai Seal-First Trade Development Co.,Ltd. tel:021-64979220
fax:021-64979220  add:1594# Longwu Road,Shanghai